St Itts Link Bridge

Gatwick Airport

December 2010

Further to the successful completion of the implementation of a new transit coach serving the North and South Terminals and associated transit station refurbishments, designs were prepared for the South Terminal link bridge fit out.

The resultant simple but highly effective design features, aimed to coordinate with the recently refurbished Inter Terminal Transit Station, were completed in 2010 following a very short design development and on site fabrication period. Aimed to coordinate with the recently refurbished Inter Terminal Transit Station.

The works included the full detailed design drawings for the refurbishment of the existing ‘nodes’ and link bridge, as well as the replacement of the two passenger conveyors.